State Support for OSBB Backup Power: Program Overview

Author: Svitlo-Lux editorial team. Published , updated . Review (editorial): approved (Project owner).

Facts on this page were checked against official sources as of ; next check by . Terms change: open the official source before making a decision.

State support for OSBB (condominium association) backup power currently consists of several separate programs with different operators, different terms and different application statuses. Below is a short map of what we checked on the official pages on 23 October 2026, and where to go for terms that may change.

Program map

Programs for OSBB and housing cooperatives (ZhBK) as of 23.10.2026 (sources: energy.kmu.gov.ua, energycredit.bdf.gov.ua, eefund.org.ua, diia.gov.ua)
ProgramWhat it isStatus per the official pageOur page
SvitloDIMNon-repayable support for backup power equipment, applications submitted through DiiaActive; the list of regions is expanding, check the application status in Diia/programy/svitlodim/
Loan and compensation (5-7-9%)Preferential bank loan and partial state compensationActive since February 2026 according to the government and Entrepreneurship Development Fund pages/programy/kredyt-ta-kompensatsiia/
GreenDIMEnergy Efficiency Fund grantNew applications suspended according to the Fund page/programy/hrindim/
City programsDecisions of local councilsDiffers by city, not verified/programy/miski-prohramy/

Where an OSBB should start

  1. Define the need. Backup power for the elevator and pumps, own generation or a heat pump: this determines which programs fit at all. The backup power calculator gives an approximate scale.
  2. Check the building type and height. The number of floors determines the amount in SvitloDIM, and the type of equipment determines the compensation percentage in the loan program.
  3. Read the operator page. Open the official program page and note the date and the application status.
  4. Calculate the residents’ share. The difference between the project cost and the support has to be collected from residents; see the calculation on the program pages.
  5. Hold a meeting. The decision to participate and on contributions is made by co-owners under your charter and the law; the legal steps are described in the OSBB section.

In this section

  • SvitloDIM programme

    What the government and Diia say about SvitloDIM as of 23.10.2026: who can apply, for what equipment, amounts by floors, reporting and program term.

  • Loan and compensation for OSBBs (5-7-9%)

    Preferential loan for OSBB and housing cooperatives (ZhBK) with Energy Efficiency Fund compensation: rates, amounts, own share, steps and page discrepancies.

  • GreenDIM programme

    In preparation: the terms are not confirmed by an official source as of the check date.

  • City support programmes for OSBBs

    How to find out whether your city has its own OSBB support program, which questions to ask and how to calculate residents’ contribution alongside state programs.

Next steps

Estimated project cost

Sources

This material is for general information only and is not a power supply design, legal or financial advice. Calculations are indicative; installation and protection selection must be done by qualified specialists only. The platform does not accept or hold funds.